16.6 C
Los Angeles
Monday, March 17, 2025
16.6 C
Los Angeles
Monday, March 17, 2025

Mount Poonamallee Road is in a poor condition beyond Porur

INDMount Poonamallee Road is in a poor condition beyond Porur


Eyesore: The margins of the stretch between Dr. Ramachandra Hospital and Iyyappanthangal are dumped with garbage.

The Metro Rail project has been speeded up on Mount Poonamallee Road where an elevated corridor is being built from Alandur to Poonamallee. The condition of the road, beyond Dr. Ramachandra Hospital, from Porur to Iyyappanthangal is poor. While the Highways Department has taken up patch work from Alandur till Porur, the stretch from Porur to Iyyappanthangal has been left unattended. The margins of the stretch between the hospital and Iyyappanthangal are dumped with construction debris. Adding to the mess is the dumping of garbage. 

M. Iniyan, Porur.

Official responds:

A senior official of the Highways Department says the elevated corridor from Alandur to Porur has been completed and so the patch work has been taken up. The Metro Rail work is yet to b completed from Porur to Iyyappanthangal. Hence, the patch work is pending. Very soon the damaged portion of the arterial road would be repaired.

Road work delayed

The Highways Department is widening the Velachery-Tambaram Main Road. The widening of the Velachery Main Road-Camp Road Junction near Selaiyur has almost been completed. But pedestrians are unable to access the road owing to the delay in the paving of the expanded portion.

Deepak Kumar Vasudevan, Selaiyur.

(Readers can write to this column at readersmailchennai @thehindu.co.in)



Source link

Check out our other content

Check out other tags:

Most Popular Articles